Laser-Cut Structural Steel Construction

This revolutionary system turns precision cut tubing into interlocking, uncompromisingly strong joints. It’s perfect for virtually any structure that needs large, unimpeded space – Stadiums, Hangars, Auditoriums, Airports, Convention Centers, and Factories.

  • Assembles in a fraction of the time normally associated with traditional construction methods
  • Improved weld strength and quality
  • Holds extremely tight tolerances
  • Drastically reduces build time
  • Reduces the need for skilled labor and lowers labor costs in general
Click on each frame below to view how this technology was used to build our own World Technology Center in Minokamo, Japan and the Nagashima Spa Dome at the Nagashima Water Park.

Nagashima Water Park project   Pre-cut architectural tube   Assembly Process   Precise fit during assembly   Ease in assembly
Nagashima Water Park project
  Pre-cut architectural tube   Assmebly process   Precise fit during assembly   Ease in assembly
Fittings for assembly   Fixture holding assembly   Completed frame   Fixture for easy assembly   Final Assembly
Fittings for assembly
  Fixture holding assembly   Completed frame   Fixture for easy assembly   Final assembly
Moving frame to construction site   Installing into place   Fame installed in place   Completion of building  
See this amazing construction process on these select videos!
Moving frame to construction site
  Installing into place   Frame installed in place   Completion of building    



Terms of Use Privacy Statement
Contact Us

Copyright © 2006 Mazak Optonics Corporation. All rights reserved.